Our projects

Three projects: the problem, what we did, and what changed.

45-storey mixed-use tower

Modern high-rise mixed-use tower

Jeddah, Saudi Arabia

The problem: offices, a hotel and apartments in one tower, each with different rush hours.

What we did: a sky lobby and destination dispatch, so elevator groups share shaft space.

Average wait time
25 sec
Shaft space saved
15%
Spare capacity for growth
20%

Office complex modernization

Commercial office building

United Kingdom

The problem: eight 20-year-old elevators breaking down too often.

What we did: a phased upgrade of controls and doors. No tenant had to move out.

Fewer breakdowns
85%
Energy saved
35%
Average wait time
22 sec

Hospital elevator optimization

Modern hospital building exterior

Saudi Arabia

The problem: waits of over three minutes at shift changes and visiting hours.

What we did: regrouped the twelve elevators and adjusted their controls. No new equipment.

Peak wait, down from 3.5 minutes
55 sec
On-time patient transport
95%
Of the cost of replacement
5%

What a client said

Doug & Danny provided exceptional insight during our tower project. Their traffic analysis was thorough and data-driven, and their design recommendations saved us significant shaft space without compromising passenger experience. We would not hesitate to engage them again on future developments.

Project Manager, leading developer, Jeddah

Have a similar project?

Tell us about it. The first consultation is free.

Get a free consultation